Tears of gratitude flow as the people heed her call, expressing their support for Mian Sb’s political struggle for civilian supremacy. Thousands are still stuck on the roads, and Minar-e-Pakistan is filled to capacity! PMLN voters have responded in an overwhelmingly massive manner! Let us calculate:
The area highlighted was the main commemoration area (193577.12 m²) and if we be just enough a person who occupies 0.09 (70 per centile; those who are enthusiasts) to 0.19 (crowd phobic) square meters, then
From the ‘Ketcheri’ to Data Sahib, and from Data Sahib to Liberty Chowk, only lions, true lions, were being seen, gathering to welcome their lionhearted leader. The motorway remained heavily congested. The traffic had slowed down significantly from Pindi Bhattian onwards. The vans are moving at a mere speed of 10 to 15 km/h. No matter, it was being suggested that from Sialkot Bypass till the venue, there were cars and busses. The distance from Lahore-Sialkot bypass to lari adda lahore is 13.9 km,so according to normal distribution, and it is majorly a two lane road, so if each car (The average length of a sedan car typically ranges from about 4.5 to 4.8 meters) had 4 passengers on average and each bus/wagon (They may range from about 12 to 15 meters) had 22 people on average and for every 5 cars there was one wagon/bus then there were around.