This approach is especially effective for:
- Factories with steady base load
- Plazas and offices with daytime operations
- Institutions where export approval is delayed or denied
Advanced Solution: PCS + BESS for Grid-Independent Signaling
For larger and more sophisticated installations, we move one level up.
Using a Power Conditioning System (PCS) with a Battery Energy Storage System (BESS), existing on-grid inverters can be made functional even without live grid reference.
What’s Actually Happening Technically?
- The PCS generates a synthetic grid signal
- Voltage is provided 180° apart and 120° out of phase (3-phase simulation)
- On-grid inverters “see” a grid and continue producing
- Energy is absorbed by loads and/or batteries
This is not theory. We’ve deployed it in controlled industrial environments where grid export was legally or technically impossible.
Result: Existing assets keep earning value instead of becoming stranded.